Interior metal stud partition

A non-rated apartment partition with an acoustic blanket.

A non-rated apartment partition with an acoustic blanket.

Layers, in order

#LayerThicknessSpacing
11/2 in gypsum board, side A1/2 in
23 5/8 in metal studs3 5/8 inat 16 in o.c.
3Acoustic blanket3 in
45/8 in water-resistant gypsum board, side B5/8 in

Build steps

  1. Frame the studs (Framer). Tracks, then studs at 16 in.
  2. Board side A (Drywall). Board on one side of the studs.
  3. Insulate the cavity (Insulator). Insulation fitted between the studs.
  4. Board side B (Drywall). Board on the other side.

Materials per 100 sf of wall

From the takeoff of Setout's sample building, across every wall of this type on the typical floors, after doors and windows are cut out. Use it to sanity-check a bid, not as a substitute for a takeoff.

MaterialPer 100 sf
1/2 in dry gypsum163 sf
3 in acoustic blanket100.0 sf
5/8 in water-resistant gypsum36.5 sf
3-5/8 in main tracks26.9 lf
3-5/8 in regular stud layout positions15.3 ea

See it in 3D

Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.

Send us your drawingsGet a price for your building