What the steel takeoff includes
- Beams and columns by section (W, M, S, HP, C, MC) and length, weighed in pounds.
- Bearing plates and anchor bolts at masonry bearings, from the standard details.
- Composite metal deck, pour stops and closures.
- Headed shear studs at the spacing the drawings call for.
- Slab concrete on deck, in cubic yards, and welded wire fabric.
- Stair stringers, headers and landings from the stair framing details.
Traced to the framing plan
Each member is drawn on its framing sheet and in 3D, so a fabricator's tonnage can be checked member by member. See the floor structure as built: W8 beams, composite deck and lightweight concrete.
Questions
Do you include connections?
We include what the drawings show: bearing plates, anchor bolts and studs. Connection design that is left to the fabricator is withheld and flagged.