A bathroom sink with its trap, vent and hot and cold water.
Layers, in order
| # | Layer | Thickness | Spacing |
|---|---|---|---|
| 1 | Lavatory | 20 in | |
| 2 | 2 in waste and trap | 1 1/2 in | |
| 3 | 1.5 in vent | 1 1/2 in | |
| 4 | 1/2 in cold water with stop | 1/2 in | |
| 5 | 1/2 in hot water with stop | 1/2 in |
Build steps
- Rough in the waste, vent and supplies (Plumber). Tested before the wall is closed.
- Set the lavatory (Plumber). With its trim.
See it in 3D
Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.