A 3 ft 6 in painted steel pipe railing with pickets, posts sleeved into the curb.
Layers, in order
| # | Layer | Thickness | Spacing |
|---|---|---|---|
| 1 | 3'6H painted steel pipe railing, 1" rod pickets at 4-3/4" o.c. | 1 1/2 in | at 4.75 in o.c. |
| 2 | 2" pipe sleeves, epoxy grouted, posts embedded in the curb or wall top | 2 in | at 48 in o.c. |
Build steps
- Set the railing (Ironworker). Cast the sleeves into the curb or wall top, set the posts and grout them, then weld and grind the rails and pickets smooth and paint.