Steel pan stair with concrete-filled treads

Channel stringers, steel pans, concrete fill and vinyl treads.

Channel stringers, steel pans, concrete fill and vinyl treads.

Layers, in order

#LayerThicknessSpacing
1MC12x10.6 channel stringers, two a run12 in
2Steel pan treads with subtread and riser1/8 in
32 in concrete tread fill2 in
4Vinyl stair treads1/8 in

Build steps

  1. Set the stringers (Ironworker). Bolt the stringers to the landing headers with the end angles; the cellar run's feet sit on clip angles on grout.
  2. Weld the pans (Ironworker).
  3. Fill the pans (Concrete).
  4. Set the vinyl treads (Flooring).

See it in 3D

Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.

Send us your drawingsGet a price for your building