Channel stringers, steel pans, concrete fill and vinyl treads.
Layers, in order
| # | Layer | Thickness | Spacing |
|---|---|---|---|
| 1 | MC12x10.6 channel stringers, two a run | 12 in | |
| 2 | Steel pan treads with subtread and riser | 1/8 in | |
| 3 | 2 in concrete tread fill | 2 in | |
| 4 | Vinyl stair treads | 1/8 in |
Build steps
- Set the stringers (Ironworker). Bolt the stringers to the landing headers with the end angles; the cellar run's feet sit on clip angles on grout.
- Weld the pans (Ironworker).
- Fill the pans (Concrete).
- Set the vinyl treads (Flooring).
See it in 3D
Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.