Steel stair landing on deck

A channel header and wall angle carrying a concrete-filled deck.

A channel header and wall angle carrying a concrete-filled deck.

Layers, in order

#LayerThicknessSpacing
1C8x11.5 header and L4x4 wall angle8 in
21-1/2 in x 18 ga metal deck1 1/2 in
36x6 W1.4xW1.4 welded wire fabric1/8 in
43-1/2 in concrete over the deck3 1/2 in

Build steps

  1. Set the header and wall angle (Ironworker). Header in its wall pockets (or on L brackets with two 5/8 in anchors each end); L4x4 bolted to the wall at 24 in.
  2. Lay the deck (Ironworker).
  3. Place the mesh (Concrete).
  4. Pour the landing (Concrete).

See it in 3D

Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.

Send us your drawingsGet a price for your building