A channel header and wall angle carrying a concrete-filled deck.
Layers, in order
| # | Layer | Thickness | Spacing |
|---|---|---|---|
| 1 | C8x11.5 header and L4x4 wall angle | 8 in | |
| 2 | 1-1/2 in x 18 ga metal deck | 1 1/2 in | |
| 3 | 6x6 W1.4xW1.4 welded wire fabric | 1/8 in | |
| 4 | 3-1/2 in concrete over the deck | 3 1/2 in |
Build steps
- Set the header and wall angle (Ironworker). Header in its wall pockets (or on L brackets with two 5/8 in anchors each end); L4x4 bolted to the wall at 24 in.
- Lay the deck (Ironworker).
- Place the mesh (Concrete).
- Pour the landing (Concrete).