The cellar compactor under a stainless refuse chute.
Layers, in order
| # | Layer | Thickness | Spacing |
|---|---|---|---|
| 1 | Trash compactor, Auto-Pak Gobbler, 5 HP | 75 in | at 67 in o.c. |
| 2 | Refuse chute, 24 in stainless steel (Horizon) | 24 in |
Build steps
- Set the compactor (Equipment installer). Set the compactor on its skid under the chute, wire the 5 HP power unit and the controls.
- Connect the chute (Chute installer). Join the chute's discharge to the hopper.
See it in 3D
Every wall and floor in Setout opens as an exploded build-up like this one, layer by layer, with the steps to build it. Try it on the sample building, or see how a Setout takeoff works.